| |
概觀
| 基礎資料 | | 類型: | 直升機 (渦輪機) | | 品牌: | Agusta | | 型號 1: | A109E Elite | | 製造年: | 2003 | | 系列號: | 11169 | | 屬性: | IFR許可 IFR裝備 停留在機庫 | | 最後一年的: | 11/2025 | | 地點: | 德國 | | 縂時間(TTAF): | 1200 h | | 價格: | 詢價 | | 所有的細節 |
| 銷售者 |
HERREOS Aviation GmbH Am Flugplatz - Haus 4 63329 Egelsbach 德國
電話: +49 171 7137167 |
| 聯係銷售者 |
|
|
|
細節
| 基礎資料 | | 類型: | 直升機 (渦輪機) | | 品牌: | Agusta | | 型號 1: | A109E Elite | | 製造年: | 2003 | | 系列號: | 11169 | | 屬性: | IFR許可 IFR裝備 停留在機庫 | | 最後一年的: | 11/2025 | | 地點: | 德國 | | 縂時間(TTAF): | 1200 h | | 價格: | 詢價 | | 乘客數: | 5 |
| 多個發動機 | | 發動機數量: | 2 | | 製造商/型號: | Pratt & Whitney / 206C | Pratt & Whitney / 206C | | 時間總計: | 1200 h | 1200 h |
| 航空電子設備 | � 4 x EFIS Glass Cockpit (2 x EADI, 2 x EHSI)
� 2 x GTN 650H GPS/NAV/COMM/MFD (STC)
� 1 x GTX 355R Transponder (STC)
� Airframe Hours Meter
� 3 Axis Duplex AFCS
� Weather Radar RDR 2000
� Flight Director and Autotrim
� 2 x Vertical Gyros
� Radio Altimeter
� 2 x VOR/ILS/VIR Systems
� 2 x VHF/AM Systems
� KMD 550 Multifunction Display
� Traffic Advisory System + L3 Skywatch |
| 裝備 | � Integrated landing light
� Increase landing weight 3.000 kg
� Baggage Compartment
� Baggage Compartment Extension
� Main Transmission Oil Temperature Limit Extension
� Incl. Supplementary Fuel Tank (Total 221 US Gall)
� Pulsed Chip Detectors (Transmission and Engines)
� Environmental Control System
� MGB Vibration Isolator Struts (Lord)
� L/H & R/H Windshield Wipers |
| 外觀 | � Elite Version
� Single/Dual Pilot IFR (TCDS EASA.R.005)
� Increase MTOW of 3.000 kg
� 221 UsGall Fuel System
� R/H Electrically Operated Passenger Step
� Reinforced Windshields |
| 内部 | � Elite completion including:
- Paulstra Soundproofing
- Alcantara Leatherette Covered Liners
- VVIP 3 Seats AFT Facing Bench with �See-Through� Armrest
- Floor Courtesy Light
- Floor Carpeting
- Pilot Multipurpose Holder
- Pilot Console Tray
- 6 Active Noise Reduction headsets
- VVIP 2 Seats FWD Facing with Rear Cabinet Bar
- Single Refrigerated Drawer under Central Bench
- Leather Bellows on Flight Controls
- Carpeting Protection
- Soundproofing Double Windows |
| Inspection Status | Last annual completetd NOV 2025
1200h inspection carried out at 1169h
1200h/6y inspection carried out at 1169h, dated FEB 2024
3200h/6y inspection carried out at 1188h, dated NOV 2025 |
圖片
聯繫供應商
|